Sun, Jan 15, 2017
CRN, the historical shipbuilder and Italian brand part of the Ferretti Group specialising in the construction of fully-custom steel and light aluminium alloy pleasure vessels between 40 and 100 metres in length, recently performed a major procedure -- the relocation of the new 79-m megayacht, bound to become the second largest yacht ever built by the Ancona shipyard.
The yacht, weighing more than 1,000 tonnes, was skilfully moved 800 m over a span of two hours from one hangar into another. Considering the imposing size of this vessel, its relocation required the utmost care and expertise of CRN's workers.
This spectacular relocation showed the impressive volumes of this new massive megayacht - hull number 135 - designed by CRN’s Technical Department in cooperation with Studio Zuccon International Project, who designed its exteriors, and with Studio Laura Sessa, who took care of interior design.
Entirely Made in Italy and bound soon to become one of the brand's most iconic products, the new 79-m megayacht will be characterised by slender lines, airy spaces, and a great care for details.
Besides 79 m MY CRN 135, three more superyachts are currently under construction at the Ancona shipyard: soon-to-be-launched 74 m MY CRN, 50 m MY CRN Superconero, and 62 m MY CRN 137.
-
Knud E Hansen launches adventure cruise vessel
Wed, Jun 19, 2019 -
Lürssen brings Madsummer to MYS
Mon, Jun 17, 2019 -
Power-packed Sunreef
Spring/Summer 2019 -
Explore with Esquel
Spring/Summer 2019 -
Immersive Experience
Spring/Summer 2019 -
Dynamiq's new explorer yacht
Thu, Jun 6, 2019 -
Fraser sells nine yachts in three weeks
Mon, May 13, 2019 -
Suprema 36 to debut at Kuwait show
Mon, Mar 25, 2019 -
Spectacular Kuwait Yacht Show set
Thu, Mar 14, 2019 -
‘Golden Year’ for Azimut
Winter 2019 -
Going Giga Again
Winter 2019 -
Making a Superyachts Wave
Winter 2019 -
DIBS Makes a Splash
Winter 2019 -
Oceanco reveals an explorer
Thu, Feb 28, 2019 -
Dubai Harbour set for launch
Mon, Feb 25, 2019